Construction project management: planning, scheduling and controlling.
Material type:
Item type | Current library | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|
![]() |
KsTU Library General Stacks | TH 438 chi1998. (Browse shelf(Opens below)) | Available | 115300 |
Includes index.
There are no comments on this title.