000 | 02080cam a2200361 a 4500 | ||
---|---|---|---|
001 | 17498643 | ||
003 | OSt | ||
005 | 20220922154058.0 | ||
008 | 121017s2014 flua b 001 0 eng | ||
010 | _a 2012037627 | ||
020 | _a9781466517332 (hardback) | ||
040 |
_aDLC _cKsTU _dDLC |
||
042 | _apcc | ||
050 | 0 | 0 |
_aTP155.75 _b.sah 2014 |
082 | 0 | 0 |
_a338.6/042 _223 |
084 |
_aSCI013060 _aTEC009060 _aTEC016000 _2bisacsh |
||
100 | 1 | _aSahoo, Trinath. | |
245 | 1 | 0 |
_aProcess plants : _bshutdown and turnaround management / _cTrinath Sahoo. |
260 |
_aBoca Raton : _bTaylor & Francis, _cc2014. |
||
300 |
_axxiii, 382 p. : _bill. (some col.) ; _c24 cm. |
||
504 | _aIncludes bibliographical references and index. | ||
520 |
_a"With large amounts of revenue at stake, process industries are focusing more on turnaround management as they strive to lengthen the interval between turnarounds. This book outlines a strategy to execute optimized shutdown and turnaround by changing plant operating conditions and inspection techniques. Because shutdown cost for a petroleum refinery is normally 30 percent higher than annual maintenance costs, this book details how to manage the more favorable turnaround option. The author explores different aspects, including philosophy, planning and scheduling, estimation, contractor management, and execution. The book also addresses safety management, human resources management, and post-shutdown review"-- _cProvided by publisher. |
||
650 | 0 | _aChemical process control. | |
650 | 0 |
_aChemical plants _xSafety measures. |
|
650 | 0 | _aIndustrial management. | |
650 | 0 | _aPlant shutdowns. | |
650 | 7 |
_aSCIENCE / Chemistry / Industrial & Technical _2bisacsh. |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING / Industrial Engineering _2bisacsh. |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING / Industrial Design / General _2bisacsh. |
|
906 |
_a7 _bcbc _corignew _d1 _eecip _f20 _gy-gencatlg |
||
942 |
_2lcc _cBK _n0 |
||
999 |
_c1793 _d1792 |